Flooring
Carpet-to-LVP Update
Upstairs carpet was removed and replaced with durable LVP, prepared over the existing wood subfloor and finished with new perimeter trim.

Project Details
What This Project Included
- Project type
- Flooring
- Related service
- Flooring Repair & Installation
- Materials & finish details
- Luxury vinyl plank flooring
- Shoe molding
- Subfloor preparation materials
The Goal
What the Homeowner Wanted
Replace the upstairs carpet with a cleaner, more durable LVP floor.
The Result
How It Came Together
The upstairs carpeted area was converted to a durable LVP floor with clean edges and finished perimeter trim.
Work Completed
A Clear, Coordinated Scope
- Carpet, padding, and tack-strip removal
- Wood-subfloor preparation
- LVP flooring installation
- Shoe-molding installation
Before & After
See the Change
Drag the control to compare the same area before and after the work.


Project Photos
Before, During & After
These photographs show the work in progress and the details that brought the project together.
Planning Something Similar?
Start With a Conversation and Walkthrough
Tell Montana what you want to change and where the project is located. You will get direct follow-up about the next step.


